2026-11-03

Maintenance log: replacing the sheets

Entry for the third weekend of March. All four boats had their mainsheets and jib sheets inspected, and three sets were replaced. The old ropes were still usable for dock lines, but they had gone stiff and furry, with a flat, shiny patch where each one ran through the ratchet block. A tired sheet is a poor friend.

We chose eight-millimetre braided polyester for the mainsheets and six-millimetre for the jibs. Anything thinner cuts into the hand in a gust, and anything thicker jams in the cleats. Each mainsheet is about seven metres long, and the jib sheets four. We whipped the ends with waxed twine and sealed them with a quick pass of a lighter flame.

While the lines were off, we also checked each block for sticking and sprayed the sheaves with a light lubricant. One block had a cracked cheek, so we replaced it and kept the old one as a spare. Cleat bolts were tightened and a drop of sealant was added under two of them where we found damp.

Total time for four boats was three hours with tea breaks. Note for next year: label the new ropes with a tag so we know when they were fitted. We tend to forget what we did last spring, and this log is the only reason any of us remember.

← back